Technical Point of Oxidized Bitumen

Trade Term: FOB,CFR,CIF
Payment Terms: T/T,L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Type: Oxidized Bitumen 
  • Brand Name: Jahan Ghir Pars 
  • Min.Order: 22 Metric Ton
  • Means of Transport: Ocean, Land
Supply Capacity
  • Production Capacity: 1000
  • Packing:poly bag, craft & carton box 25kg
  • Delivery Date: within 30 days

Technical point and operating conditions are as follows:

¨ The blowing should be done from the bottom of blowing tanker. The reaction between bitumen and air is calorific .If the heat produced during the mixture is high, the heat of reaction is controlled by water injection.

¨ Admixture of air and the volume of blowing air is two important variants in blowing process.  In bitumen producing plant, bitumen 60/70 is usually got by blowing. In this case for making bitumen 90/15 or 85/25 distilled used oil or crude oil should be injected to the product according to the volume 20-25 % otherwise the fragility in bitumen lead to inferior production.

¨ Increasing the heating temperature, air injection amount, time and tower pressure increase the speed of production process reaction. The suitable temperature for production operation is 265-270°C which should be controlled not to be ascended since in high temperature and in 288°C  intensity of reaction becomes more sever and incontrollable which lead to explosion in tower.

¨ The long time stay of bitumen in tower in any condition is not in favor of system and should be delivered to drum or empty tanker after being ready.

¨ If the liquid surface in blowing tower is low, not more than particular limit should be added to the system for the extra air gather in empty parts and lead to ignition nearly. And if the temperature is kept high, the inside heat of tower ascend fats and this issue cause inside explosion and endamage the system.

¨ Blowing tower is filled up to 70%. Air injection is done in 190-232°C. The final point of blowing is specified by sampling and testing of bitumen properties. Finally the temperature of product should be kept 150- 165 °C in order to have loading and packing capability.

sales at blownasfalt dot com


Send message to this supplier
Ms. Mona
Tel: 98-990-1177392
Enter between 20 to 3,000 chatacters.
Contact Method
Jahan Ghi Pars
The Islamic Republic of Iran
Related Catalog(s): Bitumen Construction Machinery
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center