Steel Scaffolding Truss Structure for Line Array Speakers

Price: 26700.0 USD
Trade Term: FOB,EXW
Payment Terms: T/T,L/C,WU,Paypal,Money Gram
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: ITSC 
  • Materials: Galvanized steel 
  • Main tubes: 48x3mm 
  • Size: 2x2x2m/set, other size customzed 
  • Other names: Layer truss/ Scaffolding 
  • Certificates: TUV/SGS approved 
  • Company type: Manufacturer 
  • ODM/OEM: Yes 
  • Original place: Guangzhou, China 
  • Price: Factory price/no dealer 
  • Market: Global 
  • Model No.: ITSC-SC222M 
  • Place of Origin: Guangdong  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean, Land
Supply Capacity
  • Production Capacity: 100sets/month
  • Packing:Carton / Air bulble
  • Delivery Date: 5 working days

Steel scaffolding consists of pillars, horizontal pipe, diagonalized pipe, adjustable base, joint pipe,and it is simple and easy to assemble. And it is widely used in events: lifting the line array speaker, LED screen, adertisement posts, as well as different outdoor shows and events and concerts.

 

Simple diagram for scaffolding parts.

 

Item NameSteel scaffolding Structure
BrandITSC
MaterialQ235
Surface TreatmentHot zinc galvanization
Pillar Pipe48*3mm
2m
10.47kg
Diagonal Pipe48*2.5mm
2.3m
7.6kg
Horizontal Pipe48*3mm
Adjustable Foot2.245kg
Cross Section2*2m
Height2m-38m

Advantage
Heavy loading capacity and stable, 
Demountable,easy to assemble and transport
Self-locking, non-rust
ApplicationHanging line array speaker and led screen
Ootdoor shows and events
Packingstandard package or customized
Delivery Time10 working days after 30% payment
Payment termL/C,T/T,Western Union,MoneyGram

  1. Heavy loading capacity and stable, 

  2. Demountable,easy to assemble and transport

  3. Self-locking, non-rust

because of the Accessories are not easy to be lost and Good stability, widely used in bridge construction

support, hanging speaker, stage background, light frame and other fields.

Our partners

Negotiating

Specification

Quantity

Price

Packing

Delivery   Time

Terms   of Payment

Claim   for Compensation

Arbitration

Sign   a contract

Order   goods and stamp

Transfer   payment

Cash,   T/T, Western union, Money gram, L/C, ect

Prepare   production

PD   study the specification and start to arrange the production,

Check   and Testing

QC   checking and testing the quality

Packing

Generally   pack with bubble air or carton according to negotiation

Step   1

Material   Ready

Step   2

Material   Cutting

Step   3

Board   Cutting

Step   4

Punching

Step   5

Milling

Step   6

Welding

Step7

Checking

Step   8

Testing

Step   9

Packing

By sea: 15-45 days acocording to different countries

It takes 3-5 hours to set up with thespeaker towers

1.     Clean, check and maintain your scaffolding on a regular basis.

2.     Throw away the damaged or deformed scaffolding, spigot pins or couplers.

3.     Make a structural calculation for each construction you build.

4.     Store and transport your scaffolding on proper dolly.

5.     Attach loads in node points.

6.     Check how loads are attached to the speaker towers before lifting.

1.     Mix scaffolding rigging of multiple suppliers in one construction, unless specifically stated by manufacturer.

2.     Exceed the maximum loading of single spans as specified in the loading tables.

3.     Exceed the given structural data of scaffolding.

4.     Drill holes in the  tubes.

5.     Use damaged scaffolding.

6.     Attach loads to the scaffoldingdiagonals.

1.     All goods are only factory competitive price guarantee and 100% quality inspection before delivery.

2.     Instant feedback for any inquiry.

3.     Professional designs and welding.

4.     Quality satisfaction guarantee 100% return policy.

5.     Sample or trial order is acceptable, Mixed order support, fast delivery.

6.     Much rich experience in dealing with international trade and declaration with more than 8 years in this line.

We have been designing and manufacturing event truss and stages many years. Our leading design teams and strict quality control systems ensure each product from ITSC truss is reliable and ideal deals. Our quality products have well met demands of all clients around the world.

With our own factory and product line, ITSC truss can ensure the fastest delivery in the industry. What's more, we have accumulated rich resources in shipping channels, which also promise our fastest delivery time. Our standard cases can be finished within 7days and those custom-made within 8 days.

We are committed to providing the most affordable products for all customers. We have our own factory and massive production line. This ensures that we can procure all materials at much lower price than our competitors.

We promise all products from ITSC truss are the most affordable in the industry.

Choose your most reliable supplier, choose ITSC truss!

In a word, we are one of the most professional and reliable truss and stages suppliers in China. Please come to us!

 

ITSC truss is  a professional supplier and solution provider of exhibition and display system, located in Guangzhou, China.Our factory is near Baiyun AirPort, about thirty minutes drive from Baiyun Airport to factory.


Our products range includes standard and custom made exhibition booth,  and we also produce tension fabric fast trade show booth and aluminum truss system and layer.

 

About trade show services in China, we also can make and sell alumninum truss exhibition booth for your needed booth building services in different exhibition centers in Guangzhou,Shanghai, Beijing, Guangzhou, Shenzhen.


We believe that quality is the life of the factory.

 

Providing the high-quality products is our company's responsibility.

 

ITSC trus  is willing to co-operate with you and create the future brilliance together. Thank you!

 

Welcome to Shanghai; Welcome to  ITSC truss

Steel scaffolding in stock in our factory.

Steel scaffolding structure for the stage lighting fixture and LED screen and line array sound system in concerts and big events!

34x6x16m with 35000 kg ballast,13 led panels+2 line arrays susppended from scaffolding. Ringlock scaff system installed for AVB concert at Koltatta.


Send message to this supplier
Ms. Lynda Chen (Salesgirl)
Tel: 86-20-36263661
Mobile: 18665702368
Enter between 20 to 3,000 chatacters.
Contact Method
Infinity Truss & Stage Co., Limited
No. 98 Xinyi Road, Dalang Village, Shijing Town, Baiyun District,, Guangzhou, Guangdong, China (Mainland) / 510000
Fax: 86-20-36263661
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center