portal frame truss and construction steel frame for project in Southeast Asia

Price: 1000.0 USD
Trade Term: FOB,CFR
Payment Terms: T/T,L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Product Characteristics: 4)Fire- resistant, clean and health 5)50-year-long life expectancy 
  • Quality Control: The third party, SGS, ASIA INSPECTION all accept 
  • Installation: Engineer are able to stay at site to direct construction. 
  • Certificates:: ISO9000, ISO14000, ISO18000 by BV France. 
  • Model No.: 1-200 
  • Place of Origin: Shandong  
  • Min.Order: 100 Metric Ton
  • Means of Transport: Ocean, Land
Supply Capacity
  • Production Capacity: 10000 Ton/per Month
  • Packing:Components will be packaged by steel pallet
  • Delivery Date: 15 to 40 days


1. Our Design & Engineering Services for the Steel building ( made of portal frame truss ) :

1 ) Experienced and skilled team of designers including CAD designers and 3D designers has the capacity to deliver outstanding designs for your project .

2 ) Simple design service is free of charge to all clients to ensure customer .

If you require more complex engineering of structures such as load baring capacities we can also provide this service requiring designer fee .

3 ) We look forward to delivering exceptional designs and advice for your project .

Installation supervision and after-sales service :

If needed , we will dispatch our professional workers to conduct assembling guide or technical support for you on site .

 

2. Our strength on the Steel building ( made of portal frame truss ):

1) Rich experience

Rich project experience in different area of different continents.

2) Professional design and R& D team

Full solution for steel building design. We could make the design as per your requirement, or give your professional suggestion.

3) Advanced production equipment

We possess plenty of advanced production equipment for structure steel and cladding materials.

4) Quality control

Professional procurement team making sure all materials with good quality and are from China top steel mills.

Our workers have more than 10 years experiences and certification for professional welding. Half or them got the AWS and EN welder certificate.

Our factory operation under highest international standard, ensure the steel fabrication works with high technology.

 

3. Some of OUR WORKSHOP/ WAREHOUSE PROJECTS:

 

1) AREVA Transformer Factory Project:

Covering an area totaled 33, 842 sq.m, the program consumed steel in 4299 tons, the column height is 31-33 m, and the inside is installed with the bunk bed traveling crane with the maximum hoisting capacity in 400 tons.

2) NEW ZEALAND Barns / Grain Warehouses:

light gauge steel structure with cold bended profiles.

3) BOLIVIA Cement Plant:

Steel consumption: 3, 655 tons in the first phase, 7200 tons in the second phase.

4) LDK Polysilicon Public Project:

Was generally contracted by FLR CO., LTD, the total steel consumption volume for Phase I project reached over 3000 tons and this program was in a high-rise steel structure of 4-7 floors.

 

4. Our quality system and welder certificates for Steel building ( made of portal frame truss ) :

From first day of our establishment, we concentrate on making the produce as per highest international quality standard.

Based on this concept, we continuously improve our quality system, and got international certificate as below:

Got AISC qualification and CWI welding inspection certificate as per American standard, have 163 American AWS welder.

Got EN1090 qualification, TWI welding inspection certificate and IWE welding engineer as per European standard, have 54 European standard welder.

In China, there are very few companies could own all such international certificates like us.

 

5. Our seaworthy packing system for Steel building ( made of portal frame truss ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Do you have your own factory ?

Yes, we have our own factory. Our company has been engaged in steel construction field for 30 years. We set several independent workshops for steel structure and color steel sheet and sandwich panels. In addition we are well-equipped with professional designers, experienced techies and sales team. You can visit our factory any time!

 

2) What are your main products ?

steel structure, steel structure building,  prefab building, sandwich panel, handrails, Steel building ( made of portal frame truss ) and other building material. The shape, material, model, color, treatment technology of them can be customized according to your requirements.

 

3) How can I obtain a price for your Steel building ( made of portal frame truss ) ?

Tell us your requirements on the qty, dwgs, material details such as steel grade etc and we will quota for you ASAP.

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center