Structural Steel Fabrication light steel building brand new design

Price: 1000.0 USD
Trade Term: CIF
Payment Terms: T/T
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Drawing Design: dwgs Detailing by us 
  • Software used: AUTOCAD 3D3S PKPM Tekla 
  • Surface Treatment: Painted by Zinc rich paint 
  • Installation: Engineer are able to stay at site to direct construction. 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Model No.: 2-087 
  • Place of Origin: Shandong  
  • Min.Order: 50 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 9000 Ton/per Month
  • Packing:Components will be packaged by steel pallet
  • Delivery Date: usually as customers'order

1. Typical Surface treatment for Steel building ( made of Structural Steel Fabrication ) :

Surface Treatment

Hot dip galvanize 

Standard : JIS , DIN , ASTM B695 - 2000

Hot dip galvanizing hole cutting good looking on surface

Galvanizing process :

Steel structural components → Degreasing → Rinsing→ Pickling → Rinsing →

Fluxing → Galvanizing → Quenching → (Passivation) → Inspecting → Finished Product


Paint

1 . Primer paint one coat 20 - 30 um

2 . Middle paint two coat 40 - 60 um

3 . Finish paint one coat 20 - 30 um

Paint type : 1 . red primer  2 . zinc primer  3 . Alkyd primer

 

2. About the product:

1) Product scope:

Steel building ( made of Structural Steel Fabrication ), steel structure warehouse / workshop / hangar / garage / poultry house, high rise steel building, industrial steel frame, sandwich panel, welded H steel, C/Z channel, corrugated steel sheet, etc.

2) Products structure type& Service:

Design & fabrication & Engineering Service, Steel Building, Space Frames, lattice steel structure, Tubular Steel Structures, basic building elements( built-up welded H-section, hot-rolled H-section, channel, steel column, steel beam), standard frames, secondary framing, roof & wall materials.

 

3. Project case- AIRCRAFT HANGAR IN IRAN( 2013) : 

The aircraft hangar in IRAN takes up 69M* 32M square meters with partial second floor. The eave height is 7.5meter, span is 32 meter. Drainage slope is 5% .

Main steel structure: welded H steel;

Purlin: cold-rolled C section steel;

Cladding: color steel sheet with foil insulation on roof and glass wool sandwich panels.

 

4. Drawings & Quotation for the Steel building ( made of Structural Steel Fabrication ) :

1) Customized design to welcome.

2) As long as you like, we can design and provide drawings for you. Just give the technical data and your demand, we will give you the best offer.

3) In order to give you an exactly quotation and drawings, please tell us the Length, width, eave height and local weather.  We'll quote for you prompt.

 

5. Packing & Delivery for Steel building ( made of Structural Steel Fabrication ) :

For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift

For cladding: Plastic film wrap the roof and wall corrugated single steel plate.

but for sandwich panel will load into container piece by piece

This package is to protect the goods from damage, during the transportation.

 

Delivery:

Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.

Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.

 

6. FAQ:

1) Can I have a visit to your factory before the order ?

A: Why not ? welcome to visit our factory. You can fly to Jinan Airport. We will pick you up in the airport. Hotel booking service is available.

 

2) Do you supply installation service for Steel building ( made of Structural Steel Fabrication ) ?  

A: Yes, we do. But you will pay for our professional fee if we install in your local place. Then we will send engineers to supervise it.

 

3) How long can the Steel building ( made of Structural Steel Fabrication ) be used ?

A: The use life of the main structure is the designed used life, that is 50-100 years( standard request of GB) .

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center