structural steel welding light steel structure modular

Price: 1000.0 USD
Trade Term: CIF
Payment Terms: T/T
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Material Grade: European S235& S355 ASTM A36& A572 JIS SS400 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Standard: AISI, ASTM, BS, DIN, GB, JIS Australian standard 
  • Main structure: Welded H section,Lattice structure,Tubular column or beam,space frame etc 
  • Quality Control: The third party, SGS, ASIA INSPECTION all accept 
  • Model No.: 2-091 
  • Place of Origin: Shandong  
  • Min.Order: 120 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 3000 Ton/per Week
  • Packing:sea worthy packing
  • Delivery Date: 15 to 40 days

1. Specification of Steel building ( made of structural steel welding ) :

    Steel         Structure 

         Function  

      Material

Surface Finish

   Design 



main Frame 

Support / wind resistance / bearing weight

Q345 B for beam ,  column

 

painted / galvanized

portal frame or space frame



secondary frame

Support , connect and strengthen , sag rod , bracing , tie bar , etc

Q235B 

Drilling , sand blasting , paint, ready to connect




Purlin

supporting for cladding

Q235B for C or Z purlin

galvanized




Roof & wall panel

Insulation / water-proof / fire resistance / wind - resistance

sandwich panel ( EPS / rock wool / PU / glass wool ) / single skin steel sheet

Galvanized / galvalum / color coated

Corrugated / flat



thickness of sandwich panel ( 50mm / 75mm / 100mm / 150mm ) steel sheet : 0.35mm - 0.6mm

window

Daylight / air circulation / decoration

pvc steel  / aluminum alloy / glass

customized

Sliding / roll-up



Door

Security / insulation / water - proof

steel sheet / sandwich 

Prepainted / galvanized

Sliding / rolling up



Accessory

self-locked nail , steel bracket , high strength bolts , self-drilling screw , rivet , inter and outer cullis , rain spout , trimming sheet , glass cemen

Life span

                                   > 50 years

Feature

Multi - functional

perfect for workshop / warehouse / power plant / cafe / exhibition hall / GYM / Concert hall / car  - parking / 4s shops / logistics etc


Reusable

100% light steel structure material can be reused


Wide span

the max span is 36m without middle column


fast construction

prefabricated unit component


stable and durable

excellent anti - quake effects


Cost - effective

 half of the cost of common construction system


enlarge the space

make the most use of the property of steel structure


perfect combination between mechanical property and art

Different plan based on different requirements


considerate design

CAD Drawing and other software


 

2. Why Our Steel building ( made of structural steel welding ) is your Right Choice:

1) Stable and deep financial capacity

Any investment is an important decision and should be realized through a financially stable company. Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.

2) Competitive Prices

Our production capacity(approximately 200,000 metric tons annually) together with effective and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

3) Fast Quotations

Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced design software we use.

4) Fast Delivery

We are able to design, detail, fabricate and supply simple steel buildings in approximately 4 weeks. Most of our buildings are delivered and erected within 8 weeks(this relies on various factors such as site position, weather etc).

5) Site Supervision

A site supervisor is always present at site to ensure that work is being carried out satisfactorily. Any problems that arise are quickly dealt with to minimize any delays. Safety on site is also made a priority.

 

3. Project case-  Xinwenhua Center Auditorium:

Project Overview:

Fabricate and erect approximately 2500 tonnes of structural steel work. The majority being roof steel work over the auditorium which was supported by four 29m long trusses spanning between the reinforced concrete walls.

The trusses were pre-fabricated in sections and as we were faced with a very tight city centre site it was essential to work very closely with other sub-contractors to plan the on site assembly of the trusses prior to installation.

 

4. We are extremely powerful in supplying Complex Steel Structures:

We are good at flexible and versatile production for the fabrication of complex and heavy steel pieces and structures, thanks to:

1) Advanced engineering

2) Proven fabrication processes adapted for carrying out these types of unique products

3) Know-how and long-standing experience in fabrication of complex steel built-ups

4) Lifting capacity of 200 tons for handling fabrication work of heavy steel built-ups

5) Large working areas to carry out assembly work of oversized steel built-ups

6) Important fabrication capacity for large scale projects

The weight and size of these types of products or the combination of these factors can be challenging, especially in terms of handling activities in the plant and transport. As such, certain of the steel built-up components weighing over 60 tons have to be shipped in sections to the construction sites where they will be installed.

 

5. Packaging& Shipping for Steel building ( made of structural steel welding ) :

1) All the structure components, panels, bolts and sorts of accessories will be well packed with standard package suitable for ocean transport and loaded into 40' HQ.

2) All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers, who will prevent the goods to be damaged.

3) Good relationship with many vessel companies to make sure the transportation smooth.

 

6. FAQ:

1) Why should I build steel building using steel structure ?

Steel has the higher strength.

80% recyclable, Steel is the most recycled material in the world.

No warping, no cracking, no chemical treatments.

Stronger connection.

Lower transport costs due to lightweight frames.

Steel frames will not burn, fire proof.

Lightning will not affect a steel framed house since steel creates a positive earth. Lightning energy is conducted straight to the ground.

Each steel structure is a independent engineered.

 

2) How difficult is it to install Steel building ( made of structural steel welding ) ?

Too easy! Some customers who purchase prefabricated steel building choose to install their own warehouse using local erection team.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center