Company Info
Jinhong Plastic Hardware Mould Fittings Co.,ltd(https://www.jhtoolshop.com) was established in June , 2002 . We have been exploring and cultivating for many years . All our leaders , managements as well as our production department colleagues have owned good reputations in the mould industrial markets during all guidance and assistance mould components manufacturers in China . We focused on plastic hardware mould components and other related products , based from Dongguan , then quickly radiatio... view more
Company Profile
Year Company Registered:
2002-06-13
Annual Sales Amount:
US$10 – 50 Million
Total No. of Staff:
51 – 100 People
No. of R&D Staff:
21 – 30 People
No. of Engineers:
11 – 20 People
Export Ratio:
71% – 80%
OEM Services Provided:
YES
Payment Terms:
T/T, L/C, D/A, D/P, WU, other
Business Type:
Manufacturer, Trading Company
Main Export Markets:
North America, Western Europe, Eastern Europe, South America, Southeast Asia, Eastern Asia, Mid East, Oceania, Africa
Basic Info.
Product Material:Metal
Product:Others
Shaping Mode:Plastic Injection Mould
Brand Name:Jinhong
Model No.:E1860-2
Place of Origin: Guangdong
Min.Order: 1 Set/Sets
Means of Transport:Ocean, Air, Land
Supply Capacity
Production Capacity:99999 set/day
Packing:www.jhtoolshop.com
Delivery Date:3day
Jinhong mold components Two-Stage Ejectors E1860-2 Installation and use instructions:
1.Machine the mounting holes on the mould according to the deepening dimension drawing;
2.Calculate the stroke precisely, and intercept the length of the flange ring and the mandrel. Note that the ejection stroke cannot be adjusted after installation;
3.Fix the flange on the movable mould baseplate by using a hexagonal socket head cap screw, install the middle thread sleeve on the ejector plate B, and fix the central mandrel on the ejector plate A;
4.tap the internal thread at the tail of the mandrel to connect with the central mandrel of the injection molding machine. The thread size varies with the model;
5.Conduct the fit function test to check whether the movement of all parts for the secondary ejection mechanism is smooth and the stroke is consistent. (It is recommended to test on the die spotting machine or the injection molding machine. Do not use the crane.)
6.It is necessary to accurately install (usually install one ejection device on a mould) and accurately calculate the stroke, otherwise the product will be easily damaged.
7.If the mould is required to be repaired, remove the mould clamping device and then conduct the subsequent operation.
Send message to this supplier
Contact Method
Jinhong Plastic Hardware Mould Fittings Co.,ltd
NO.11,Lizhidun Street, Liheng Village, Qingxi Town,
Dongguan,
Guangdong,
China (Mainland)