The Gold Panning Vessle Exporting to France

Payment Terms: T/T,L/C,D/A,D/P,WU
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: Jin He 
  • Place of Origin: Shandong  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 500 Set/Sets per Year
  • Packing:standard export packing
  • Delivery Date: 60-180days after the deposit
Gold Panning Vessle classification:
    From the beneficiation process, the gold pannng vessel is divided into three types: fixed chute, chute tape, round jump Jig; from the mining capacity, gold panning vessel is divided into 15 liters, 25 liters, 40 liters, 50 liters, 100 liters, 150 liters,200 liters, 250 liters, 300 liters,etc.
    Gold Panning Vessle Parameters:
    1.Double floated structure 55 m long, 2.1 meters wide, 1.25 meters high: floor, side panels with 6 mm steel plate, panel 4 mm skid plate, within the floating body each interval of 60 mm channel steel, angle double-layer skeleton welding,anti-rust rust-proof paint handling.
    2.Bucket with 145, square bucket, bucket volume of 0.06 cubic meters,bucket bottom plate with 10 mm steel plate, circuit board with a 6 mm steel plate, bucket lip with 15 mm Manganese steel.
    3.The chain using ordinary steel, the wear parts using the high frequency heat treatment of 45 steel (Note: The wear parts can be replaced),the chain length of 760 mm, width 90 mm, 40 mm high.
    4.Main reducer is equipped with one model 1000,three model 250, two model 350.
    5.Power is equipped with one 55 kW electric motor, one 22 kilowatts hoist, two 5.5 kilowatts pumps.
    6.Main frame 6 meters, using 16 # channel steel manufacturing.
    7.Sand using oblique sieve screening, 1 m wide, 1.5 meters long,22 # manganese steel rail * 10 # channel steel welded.
    8.Dredging boom 50 meters long, 9 # angle steel manufacturing,Care bucket shaft 45 # steel, 60 mm diameter, 311 bearings, 311-watt box, spacing of 1.1 m.
    9.One gantry, 16 # channel steel welding.Taking off and landing dredging boom wire rope diameter of 22 # steel wire rope.
    10.Dredging boom using water round corners and underwater pentagonal wheel, the underwater pentagonal wheel with 25 mm steel plate, underwater pentagonal axle diameter 150 mm and 45 # steel, underwater the pentagonal round seal with double sealing, round corners with 15 mm steel plate, and the four corners of the axle 180 mm in diameter and 45 # steel.
    11.Pin using high frequency heat treatment of 28 mm in diameter and 45 # steel.
    12.Two chutes and six meters in length, one meter in diameter, within the chute with Japan's Sanlingcheng gold blanket.
    13.Sand row of the tail using a stone row tail chute.
Send message to this supplier
Mr. Wang Yonghe
Tel: 86-0536-3837469
Mobile: 15806471988
Enter between 20 to 3,000 chatacters.
Contact Method
Qingzhou Jinhe Ores Machinery Factory
Qingzhou, Weifang, Shandong, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center