Xi an HL series vacuum degasser

Price: 2000.0~3000.0 RMB
Payment Terms: T/T,L/C,
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • oil drilling equipment: solid control 
  • Model No.: HCQ 
  • Place of Origin: Shaanxi  
  • Min.Order: 1 Pack/Packs
  • Means of Transport: Ocean, Land
Supply Capacity
 HCQ series vacuum degasser
● High efficiency/full vacuum
● Side access door for simplified maintenance
● Compact design
● keep mud viscosity performance and improve the quality of drilling fluid.

The  HCQ series vacuum degasser is made by Xian HL Petroleum Equipment Co.,Ltd.
Due to the effect of degasser collision and separation wheel, separating drilling mud into thin layer, the invaded bubble broken and gas escape.

Vacuum degasser can wipe off the invaded gas from drilling mud quickly, restore drilling mud proportion, keep mud viscosity performance and improve the quality of drilling fluid.
Through the vacuum pump suction and gas water separator separation, gas escape to safety zone, and the drilling mud is discharged to tank outside by impeller. Because of the main motor first start, and the impeller which connected with motor is high rotation speed, so drilling mud can only from the suction pipe into the tank, not be inhaled from drain pipe.

Vacuum Degasser is a special-purpose device and a new type one for the treatment of gas in the drilling fluids. It can get rid of various gas of invasive drilling quickly. Vacuum degasser is very important for returning mud gravity, stabilizing mud viscosity and reducing drilling cost. Also, at the same time vacuum degasser can be used as a heavy-power agitator and supported applicable to all types of mud circulation purification system.

The vaccum degasser design of the structure is scientific and rational. Use belt drive, to avoid the retarding mechanism of complicated, and guarantee the trouble-free working hours is long.Drilling mud through the window of rotor jilt to wall with high speed, the bubble in mud broken thoroughly, degassing efficiency is high and more than 95%.
Send message to this supplier
Ms. lucy
Tel: 86-029-81317349
Enter between 20 to 3,000 chatacters.
Contact Method
Xi'an HL Petroleum Equipment Co.,LTD
Xin Shiji 709, Fengcheng 2 Rd., Xi'an, Shaanxi, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center