Company Info
Our factory was set up in 1983,Which cover an area of 15000 square meter.It puts press forging,maching and moulding together and is a multiple produceing company.
Our company has set up a perfect quality control system according to the ISO9000-2000 standard. In order to meet the customers' needs, we strictly control the three main procedures including purchase, processing, and sales. "Products First And Customers Priority" is our all-through principle. Our predominant products include all th... view more
Company Profile
Year Company Registered:
1983-09-01
Annual Sales Amount:
US$10 – 50 Million
Total No. of Staff:
101 – 500 People
No. of R&D Staff:
5 – 10 People
No. of Engineers:
5 – 10 People
Export Ratio:
91% – 100%
OEM Services Provided:
NO
Business Type:
Manufacturer
Main Export Markets:
North America, Western Europe, Eastern Europe, South America, Southeast Asia, Eastern Asia, Mid East, Oceania, Africa
Waterproof slab formwork steel scaffolding system with cantilever to build slab and beam
Specifications
1 formwork scaffolding cantilever 2 support slab & beam 3 to build floor / beam 4 as Doka/Peri system 5 prop joint no clamp
Product information & Price List Concrete slab formwork scaffolding system with cantilever
1 formwork scaffolding with cantilever 2 to support concrete slab / beam 3 to build roof/floor & beam 4 as Doka/Peri formwork system 5 prop joint no coupler / fasteners much faster than ringlock scaffolding / cuplock scaffolding / layher scaffolding / kwikstage scaffolding 6 steel beam instead of the timber beam / H20 beam to support slab formwork, Main beam can be adjustable to get different length, fit the request of different room sizes / steel can be reused 200 times
The combination of our slab systems : main beam / sub beam / vertical props/ horizontal props and u head jack