DIN2391/C St35 St37.4 St52.4 Steel Precision Seamless Pipe

Price: 1000.0~10000.0 USD
Payment Terms: T/T,L/C
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Model No.: DIN2391/C 
  • Place of Origin: Jiangsu  
  • Min.Order: 1 Ton
  • Means of Transport: Ocean, Air
Supply Capacity
  • Production Capacity: 500tons
  • Packing:bundled and wrapped with plastic, wooden case or as your requirement
  • Delivery Date: within 20 working days after receiving deposit

DIN2391/C St35 St37.4 St52.4 Steel Precision Seamless Pipe 

This Standard defines the technical delivery conditions for seamless precision steel tubes according to DIN 2391 Part 2 which are made from the steel grades listed in section 5.
Chemical Compositions

Grade

Mfg. Process

 

Chemical composition(%)

C

Si

Mn

P

S

Ni

Cr

Mo

Others





St30Si

S

0.10Max

0.30Max

0.55Max

0.040Max

0.040Max

-

-

-

-





St30A1

S

0.10Max

0.05Max

0.55Max

0.040Max

0.040Max

-

-

-

Al deoxydized





St35

S

0.17Max

0.35Max

0.40Max

0.050Max

0.050Max

-

-

-

-





St45

S

0.21Max

0.35Max

0.40Max

0.050Max

0.050Max

-

-

-

-





St52

S

0.22Max

0.55Max

1.60Max

0.050Max

0.050Max

-

-

-

-







Mechanical Properties(Mpa)

Grade

 

Material 
number

Tensile Test MPa or N/mm2

Remaks 
(Similar to JIS)

Possibility Temperature

Min Yield point

Tensile Strength

St30Si

1.0211

-

400Min

(STKM11)


-

355Min


-

285Min


215

295~420


St30Al

1.0212

-

400Min

(STKM11)


-

355Min


-

285Min


215

295~420


St35

1.0308

-

440Min

(STC38)


-

370Min


-

315Min


235

340~470


St45

1.0408

-

540Min

(STKM13)


-

470Min


-

390Min


255

440~570


St52

1.0580

-

590Min

(STKM19)


-

540Min


-

490Min


350

490~630




Delivery Condition

Term

Symbol

Explanation

Cold-finished/hard
(cold-finished as-drawn)

BK

No heat treatment after the last cold-forming process. The tubes therefore have only low deformability.
Cold-finished/soft
(lightly cold-worked)

BKW

After the last heat treatment there is a light finishing pass (cold drawing) With proper subsequent processing, the tube can be cold-formed (e.g. bent, expanded) within certain limits.
Annealed

GBK

After the final cold-forming process the tubes are annealed in a controlled atmosphere or under vacuum.
Normalized

NBK

The tubes are annealed above the upper transformation point in a controlled atmosphere or under vacuum.

 

DIN2391/C St35 St37.4 St52.4 Steel Precision Seamless Pipe  


Hi,this is Chrisina,thanks very much for your interest in our products,If you want such steel tubes and pipes,or the standard is not listed above,pls do not hesitate to contact me at once.pls tell me,it's my honor to service you!

 

 

Christina Skype: christina.haibinjx

 

Tel:+8618056100777



Send message to this supplier
Mr. Kevin Wang
Tel: 86-512-56328002
Mobile: +86-18015528389
Enter between 20 to 3,000 chatacters.
Contact Method
Zhangjiagang Renaissance High-precision Steel Tube Co., Ltd
Bolin Industrial Park, Jingang Town, Zhangjiagang, Suzhou, Jiangsu, China (Mainland)
Fax: 86-512-56328003
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center