Printed Circuit Board Assembly | Electronic Fuel Dispenser PCBA Manufacturer

Price: 1.0 USD
Trade Term: EXW
Payment Terms: T/T,L/C,D/A,D/P
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • green soldermask: white silkscrren 
  • Model No.: pcba-15 
  • Place of Origin: Guangdong  
  • Min.Order: 1 Piece/Pieces
  • Means of Transport: Ocean, Air
Supply Capacity
  • Production Capacity: 200000pcs per month
  • Packing:bubble bag and regular carton
  • Delivery Date: 3 weeks

Supplier: Shenzhen Grande Electronics
Layers: 8
Application:Printed Circuit Board Assembly | Electronic Fuel Dispenser PCBA Manufacture
PCB:FR-4/1.6mm, 1oz finished copper
Surface Treatment: ENIG
PCBA Lead time: 3-4 weeks
Packing: Anti-static bag and compartmental packing
Standard Warp:<0.75%


[Description]
1, Turnkey solution for Printed Circuit Board Assembly | Electronic Fuel Dispenser PCBA Manufacture.
2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout.
3, Electronic Contract Manufacturing.
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, the Internal Circuit Test (ICT) , Functional Test (FCT)
8, Sample and small batch order are accepted.

PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP 
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on. 

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customer's requirement.


Send message to this supplier
Ms. Violet Law (Sales Manager)
Tel: 86-755-83261869
Enter between 20 to 3,000 chatacters.
Contact Method
Shenzhen Grande Electronics Co.,Ltd
A510-512 Car Building, No.45 zhenhua Road, Futian District, Shenzhen, Guangdong, China (Mainland) / 518031
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center