how do you repair cracks and chips in a concrete driveway

Price: 1500.0~1800.0 USD
Trade Term: FOB
Payment Terms: T/T,WU
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: Huineng 
  • Usage: repair cracks and chips in a concrete driveway 
  • Open to traffic: 1 hour 
  • Main raw material: Concrete 
  • Color: Grey 
  • Setting time: Initial setting:25mins,Final setting:35mins 
  • Compressive strength: 33.0Mpa/2h, 66.1Mpa/1d, 90.5Mpa/28d 
  • Pulling strength: 2.8Mpa 
  • Expansion rate: 0.01% 
  • Validation report: MSDS 
  • Certificate: ISO9001:2000 
  • Model No.: SC 
  • Place of Origin: Henan  
  • Min.Order: 5 Ton
  • Means of Transport: Ocean, Air
Supply Capacity
  • Production Capacity: 1000ton/month
  • Packing:Paper plastic composite bag packaging, 25Kg/bag.
  • Delivery Date: Within 7 working days

                                          crack filler for concrete drive way


how do you repair cracks and chips in a concrete driveway? pls check follow repair process:

For concrete crack on drive way, we suggest you use SC type concrete repair material.


Because:

1) SC concrete repair material is mainly repair for: concrete slab corner crack, serious crack,

edge failure, pothole and depression etc.


2)SC type concrete repair material have follow advantage:

  • Rapid repair, 1 hour open to traffic

  • Good adhesion,Compressive & Flexural strength is 2 times of normal concrete.

  • Toughness & impact resistance strength is 5-8 times of normal concrete.

  • Frost resistant & sulphate corrosion resistant, non- toxic, non-corrosive. 

  • Beautiful,uniform color,Expansion shrinkage coefficient is basically same.

  • Simple & rapid construction,Can be used as first-aid repair materials in damp environment.


3)Testing data of 28 days:

Test items

Unit

Technical requirement

Test result

Individual conclusion

Setting time

Initial setting

Min

≥20

25

Meet requirement

Final setting

≤60

35

Compressive strength

4h

Mpa

≥20

33.0

Meet requirement

1d

≥40

66.1

28d

≥50

90.5

Pull strength

28d

Mpa

≥2.0

2.8

Meet requirement

Expansion rate

28d

/

0.00%-0.1%

0.01%

Meet requirement

4)Compare of before and after repaired:

5)Benefit analysis:

SC cement road repair material have super strong compressive strength, 

adhesion strength and durability.Rapid,efficient repair to disease area.after completed repair, 

1 h can open to traffic. 

Compared with cement road paving asphalt, this method have 4 big advantage:

1)Can save some money of repairing in earlier stage. 

2)Repair service life is long

3)Road bearing capacity is high

4)Adhesion force is far more than asphalt, save time and labour in later period maintenance, don't need repair again and again.







Send message to this supplier
Ms. alisa (saler)
Tel: 86-371-65775236
Mobile: 13526768303
Enter between 20 to 3,000 chatacters.
Contact Method
Henan Huineng Road And Bridge Technology Co.ltd.
Mazhai Industrial Estate, Erqi District, Zhengzhou, Henan, China (Mainland) / 450000
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center