PVC / Plastic Cushion Mat (Carpet) Extrusion / Production Line / Making Machine
PVC / Plastic Cushion Mat (Carpet) Extrusion / Production Line / Making Machine is designed with the foam layer in which the bedload can be hided could keep the chamber clean.
The design without the foam layer can make water and dirt exude, keep the surface dry and clean, so it is suitable to the outside.
With the soft loop layer, feel comfortable walking on the mat.
The abrasion of the mat with the thick loop is better .
More color, more suitable to the chamber decoration.
Easy to keep clean, just gently flap or bath.
The words and design could be printed on the surface according to the order
PVC / Plastic Cushion Mat (Carpet) Extrusion / Production Line / Making Machine Technical parameters:
Model |
Width(mm) |
output(kg/h) |
power(kw) |
Dimension(m) |
MA-1220 |
1220 |
90-150 |
120 |
36*4*4 |
MA-1830 |
1830 |
220-280 |
160 |
40*6*4 |
PVC / Plastic Cushion Mat (Carpet) Extrusion / Production Line / Making Machine Pictures:
1.Seller supply full set of technical document, cutter and other full document (write in English) for the extrusion
machine.
2. Seller supply training for buyer's staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer's factory.
4. Buyer should pay the expense for our engineers including for our engineer including round- way tickets,
inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all
conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing and
testing these machines.Buyer should pay 60USD/day.
6. When installing, people of both sides cooperate well and carefully, buyer supplies convenient working
condition, any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-run the machine for testing and other
expenses(electric, water, air and worker) will be on seller's account, if the buyer or their representatives do
the inspection of the machines before shipment.
9. Guarantee period:14 months after shipment (the date of B/L)