HAJ Type Safety Joint

Trade Term: FOB,CFR,CIF
Payment Terms: T/T,L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: MDX 
  • Model No.: HAJ-89-229 
  • Place of Origin: Heilongjiang  
  • Min.Order: 1 Piece/Pieces
Supply Capacity
  • Production Capacity: depend on requirement
  • Packing:wooden cases
  • Delivery Date: 25days

Description: The MDX Safety Joint is manufactured to provide safe and easy release and make-up whenever disengagement becomes necessary. This dependable, field-tough tool is designed to transmit torque in either direction when placed in the drill, fishing, or wash-over string.

 

The safety joint consists of a: Pin Section, Friction Ring, Box Section

The internal connection of the safety joint is a coarse acme thread used to facilitate easy pack-off and re-engagement. A knurled release ring between the box and pin sections maintain torsion integrity until back-off procedure is initiated. An O-ring seal contains pressure while the safety joint is made up.

Safety joints are divided into type H,type J and type AJ.

Assembly and operation

To assemble, install the safety joint in the drill string as indicated below. Make up the service connection to a torque of approximately 60 to 75% of the drill string connections.

l In drill strings, the safety joint should be located above the drill collars to avoid compression.

l In fishing strings, the safety joint should be located directly above the fishing tool but below the jar or bumper sub.

l In wash over strings, the safety joint should be located between the drill pipe and the wash over pipe. Wash over Safety Joints are provided with a tool joint box thread and a wash over pipe pin thread.

To disengage the safety joint while down-hole, place pipe in tension and apply left-hand torque. Hold torque while slowly lowering pipe until safety joint breaks. Continue to unscrew safety joint to the left. To re-engage the safety joint, lower pipe until pin section of safety joint lands on box section. Apply one point of weight. Rotate to the left one or two turns. Then rotate to the right until torque builds up, indicating safety joint is made up.



Send message to this supplier
Ms. grace wang
Tel: 86-453-6187299
Enter between 20 to 3,000 chatacters.
Contact Method
Mudanjiang Dongxu Machinery drilling tools Co.,Ltd
Dongxu 2st Aimin District , Mudanjiang, Heilongjiang, China (Mainland)
Related Products
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center