Double Belt PU Sandwich Panel production Line Machinery Heat treatment

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Double Belt PU Sandwich Panel production Line Machinery Heat treatment

Technical Specifications:

1).The effective working length:24m (adjust according to customer's requirement)
2).Length & width of double belt:1400mm*267mm
3).Material of double belt:Alloy steel
4).Thickness of double belt:14mm 
5).Speed of double belt:3-10m
6).Heat treatment of double belt:HRC25º
7).Diameter of pin of double belt:φ40mm 
8).Material of pin:Alloy steel
9).Hardness of pin:HRC500
10).The plane precision of double belt: static ±0.05mm ;dynamic±0.10mm
11).Up and down synchronous precision of double belt:1/10000
12).Synchronous gear modulus of double belt:M=10
13).Diameter of synchronous  lift cylinder:φ80mm ,work pressure:16MPa
13).Adjust method of side module:electro motion adjust,auto lock ,number indicate 
14).Material of side module:project plastic(Nylon 1010)
15).Standard cushion block thickness specification:40mm,120mm 
16).Supply 50mm one set for roof side module, supply bottom module one set, supply 50mm one set for wall module
17).chain section distance of side module:3/4 inches
18).Up belt lift range:40mm -250mm 
19).Power of hydraulic motor:

Transportation


All goods will be shipped to your country, containers number will be decided with how many machines would you choose

Installation of the machine


The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:


- Installation by Suhang service technicians.
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.

Delivery extent does not comprise of:


- Media supply (electrics, etc. )to the machine(control cabinet)
- Raw material, process material
- Raw material for test
- Transport and lifting devices
- Auxiliary staff.

 

Machinery Shows

 

 

Workshop Show

 


Send message to this supplier
Mr. Tong
Tel: 86-510-88159551
Enter between 20 to 3,000 chatacters.
Contact Method
Wuxi shenghong machinery co.,ltd
No 113, xixian road, high tech park, Wuxi, Jiangsu, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center