3 Ton Cable Drum Diesel Cable Winch Puller With 200 Meters Wire Rope

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

 

3 Ton Cable Drum Diesel Cable Winch Puller With 200 Meters Wire Rope

 

 

Brief Introduction

 

It is used in power transmission and distribution engineering, telephone construction tower erection, traction cable, line, hoisting tools or heavy objects, the electric winch is driven by a belt, effectively prevent the damage of overload, there are pros and cons and the speed of file, anti reverse gear moment to ensure construction safety.

 

Features

 

small size & compact structure. The machine is now supported by gasoline engine, diesel engine, electric or imported gasoline engine.light weight. For example, the weight of 3 ton gasoline engine powered winch is 88 kgs. Equipped with diesel engine or motor, the winch is 108 kg. Equipped with imported gasoline engine, the winch is only 82 kg, which is very convenient transported. They are especially suitable for line construction in water area and mountain. String machine equipped with a small capstan, can also be used for a vertical rod, wire. One machine with two function in the wildfield helps to reduce crop losses.high efficiency. It reduces the labor intensity, improves working efficiency with less operators and convenient field command. safe and reliable. The machine has the interlocking brake device, accurate positioning, excellent braking performance , flexible usage, safety and trust.widely used. According to customers’ response and field investigation, this machine has wide usage, such as rod up, a vertical rod, the pull rod, line release, line reel, the bridge plate traction, lifting and other purposes.

 

Maintenance and safe use

 

1, the permissible load on the roll is 3T: when slow turn 3000 kg, 1800 kg when fast forward; when 5T slow turn 5000 kg, 2500 kg when fast forwarding may not overloaded.

2, 1/4 speed gear box lubrication oil must be maintained.

3, in order to prevent the phenomenon of jump block, in the allocation block that has the effect of shifting fork positioning of the ball as the spring. Therefore, when using, pay attention to check whether the top spring ball firmly. Before use, such as strong, you must replace the spring.

4, automatic brake and brake interlock should always check the wear condition of bakelite, the automatic braking gear rotation and back loose clearance is 0.5 mm, greater than 1 mm must be replaced bakelite, otherwise easily lead to brake failure and accidents.

5, speed gear box in automatic brakes when lifting, automatic braking gear issue, "Benedict, Benedict, Benedict" sound, proven speed gear is working properly, it is not this sound back to loose.

6, base of anchoring methods: by bearing support on both sides of the drum (with two holes) of the anchor point, not as an anchor point to other locations.

7, roll bearing locking screw, must cooperate with corresponding holes, instead of prohibiting the use of other screw locking screw.

8, the gear box housing is cast aluminum, screw it on too tight and unnecessary disassembly, but can not struck with a hammer.

9, after the machine by the long-distance transport, the need for a detailed examination of each component fastening screws loose, lubricating oil is normal.

10, the prime mover is gasoline, diesel, according to the machine can use regulatory requirements.

11, before each use of the machine, you should check whether the debris body, whether the impact of machine run around obstacles,

Also check each transmission, everything is normal, it can be used.

12, the machine after each use, the machine should promptly remove dust, oil and other dirt.

 

 

Technical Data 

 

Model Type Engine Power Gear Pulling Speed(m/min) Pulling Force(Ton)
JJM3C Diesel engine 4HP Slow 4 3
Quick 7 1.8
Reverse 3.5  No lifting
 

 

Test Before Delivery

 


Send message to this supplier
Mr. Wendy
Tel: 86-512-52844889
Enter between 20 to 3,000 chatacters.
Contact Method
Xinya Machinery Manufacturing Co., Ltd.
Yongfu Road, Yetang Town District, Suzhou, Jiangsu, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center