Transformer Load Voltage Adjustment Switch Tester

Price: 2.0 USD
Trade Term: FOB
Payment Terms: T/T,L/C,D/A,D/P,WU,Paypal,Money Gram
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Tester: DC Resistance of Tester 
  • Transformer Tester: Transformer DC Resistance of Tester 
  • Model No.: GDKC-2000 
  • Place of Origin: Chongqing  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 500Sets/per Month
  • Packing:Wooden Case
  • Delivery Date: 10days

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester

Introduction:

The tester can record switch operation waveform in overall pr℃ess.

The longest time is 6.4s.

It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically.

It has power-off protection, over-voltage protection, perpetual cl℃k and high-speed printing.

Specification:

Three way independent test power, the maximum output current is 0.5A.

Pr℃essing part

80C320 high speed 8 digit micropr℃essor High speed A/D converter

Maximum sampling rate

400KHz

Tester set sampling rate

10~20KHz

Max. save time of single waveform

6.4s

Transition resistance measuring

scope

0~40Ω

Measuring precision

△≦10%

Power supply

 220V±10%

Power

200W

Size

410mm´320mm´260mm

Weight

20kg

 



Send message to this supplier
Ms. cathy Jiang
Tel: 86-023-62984891
Enter between 20 to 3,000 chatacters.
Contact Method
Gold Co.,Ltd
9F/10,Jintai Building,Nanping, Chongqing, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center