Asphalt Resurfacing Process Hot In Place Road Recycler Machine 2 - 5m / Min Heating Speed

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

2-5m/min heating speed hot in place recycling equipment with ≤195 heated road surface

The construction process and quality control for hot in-place asphalt recycler 

1. Construction process

Multi-step asphalt pavement hot-in-place recycler train, independently developed by Wuxi Xitong Chuangfei Highway Equipment Co., Ltd, consists of two heaters, one miller for original road pavement, one channel heater, one channel miller, one two-layer heater and one lifting remixer, total 7 separate equipments, matched with a paver, various rollers and several dumpers to operate the hot in-place work.

. Construction preparation

(1). Clean the original road pavement of road sections intended for treatment, ensuring the clean surface and free of sundries. Patch the damaged parts like existing pot holes and erosion points of the original road pavement.

(2). Determine the heating power and travelling speed of each unit of recycling train based on the old road mixture type and on-site weather condition. Normal travelling speed of the recycler train should be controlled within 25m/min.

(3). Calibrate the additive spraying device.

(4). Design new formula based on conclusion from lab, mix the new asphalt mixture and transport to the construction site.

. Original pavement heating(first layer heating)

Use two heaters for heating, speed controlled within 25m/min. After first heater heating, the road surface temp. is controlled at about 130,the second heater heating the road surface temperature is controlled at about 160-180,which can quickly soften the old pavement at a range of 2-3cm in a low temperature road surface condition.

Quality inspection standard during construction process of old pavement maintenance 

Check Content Inspection frequency Requirement for quality or allowable deviation Standard
Visual testing At any moment Surface leveling &compaction, no distinct wheel trail

JTGF40-2004,

JTGF41-2008

 

Seam At any moment Compact, level, straight
Construction temperature Once for every 100m Conform to requirements of Table 1
Gradation of reclaimed mixture(deviation to the designed gradation) A group every day ≤0.075mm ±2%
≤2.36mm ±5%
≥4.75mm ±6%
The content of recycled asphalt A group every day ±0.3%
Regenerant adulteration rate A group every day ±5%
New material adding amount A group per unit On-the-spot survey
Marshall test Stability(kN) A group every day >8
Flow value(0.1mm) 2050
Void ratio() 34.5
Degree of compaction Every 200m/lane

Marshall indoor density:≥98%

Maximum theoretic density:94~97%

Thickness Every 200m/lane -5mm
Width Every 50 linear meter ≥ the designed width, Neat edge line, comfortable
Flatness Continual monitoring for each lane ≤1.2mm
Water permeability coefficient One place every 200m/lane ≤200ml
Frictional coefficient One place/200m Not less than 45BPN
Texture depth Not less than 0.55mm


 


Send message to this supplier
Mr. Mr. Jia Wang
Tel: 86-510-85361108
Enter between 20 to 3,000 chatacters.
Contact Method
WUXI XITONG TECHNOLOGY GROUP
No88,Xuedian South Road, New District, Wuxi, Jiangsu, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center