Farm Irrigation Submersible Sewage Pump Centrifugal Effluent 460 Voltage

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Farm Irrigation Submersible Sewage Pump Centrifugal Effluent 460 Voltage


Application:

1 Farm irrigation .
2 Pasturage drainage.
3 Waste water drainage.

 
Features:

1 Built-in leakage detector in the oil chamber can dectet leakage from the damage of the mechanical seal.
2 The power lower than 15KW is optional,not lower than 15KW is standard accessories.
3 Built-in leakage detector in the wiring box can check if a leak in it
4 Built-in heat protector in motor, it secures the protection of motor against burning out.
5 The power lower than 15KW is optional,not lower than 15KW is standard accessories.


Points for attention before starting equipment:

Warning:The water pump shall not be moved without putting off the power source. Humans shall not contact the water source where the pump is located when pumping water to prevent electric shock accidents in case there is no current leakage protective device while there is current leakage with the pump.

  1. Check the insulation condition of the stator winding with a 0-500V meter before starting the water pumps.

  2. Check whether the power and the voltage frequency used are in line with those listed on the label.

  3. Don't connect the electric wire of the water pump with the power source without any protective device (which may lead to the burning of the motor due to open-phase and overload). Refer to the connection method of the submersible pump. (refer to Page 9 for details).

  4. Submerging cable sockets of the motor into water is prohibited.

  5. Lifting and hanging the motor with the motor cable is prohibited during the transport and installation processes.

Read this Installation, Operation and Maintenance Manual carefully to guarantee the safe operation of the equipment.

 

 

Construction:

No. Name Material
GB JIS
1 Neck bolt 2Cr13 SUS420
2 Heat-Protector - -
3 Motor cover HT200 FC200
4-1 Bearing - -
4-2 Bearing - -
5 Cooling house flange Q215A LSS330
6 Shaft 2Cr13 SUS420
7 Rotor - -
8 Stator - -
9 Cooling house 0Cr18Ni9 SUS304
10 Bearing cover HT200 FC200
11 Motor casing HT200 FC200
12 Bracket HT200 FC200
13 Leakage detector - -
14-1 Mechanical seal C-Al2O3 C-Al2O3
14-2 Mechanical seal SiC-SiC SiC-SiC
15 Oil box HT200 FC200
16 Oil cover HT200 FC200
17 Washer 0Cr18Ni9 SUS304
18 Impeller nut HT200 FC200
19 Seal-ring LBC2 LBC2
20 Strainer HT200 FC200
21 Impeller HT200 FC200
22 Pump casing HT200 FC200
23 Bottom cover
Send message to this supplier
Mr. Ms. Emma Huang
Tel: 86-21-50550317
Enter between 20 to 3,000 chatacters.
Contact Method
GSD Industrial Co., Ltd.
No.796, Yun Qiao Road,undefined, Shanghai, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!