Air And Mud Pump Pneumatic Water Well Drilling Rig 260 Meters Industrial

Price: 6800.0 USD
Trade Term: FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW
Payment Terms: T/T,L/C,D/A,D/P,WU,Paypal,Money Gram
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: Nailiang 
  • Price :: Negotiation 
  • Drilling depth :: 105-260mm 
  • Power type :: Diesel 
  • Supply Ability :: 2000 sets per year 
  • Warranty :: 12 months 
  • Condition :: New 
  • Weight :: 6T 
  • Color :: Yellow 
  • Rotary Head Storke :: 3.4m-6.0m 
  • Rated Power :: 55-132KW 
  • Place of Origin: Hebei  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 2000 sets per year
  • Packing:Wooden case or naked
  • Delivery Date: Within 7-15 days

Pneumatic Drilling Rig Introduction


This is a lightweight, efficient, versatile drilling hole equipment, which borehole drilling machine is mainly applied in drilling wells, irrigation wells, geothermal wells and air holes for other purposes, especially for mountain and rock formation water engineering. The water well drilling rig machine can work on different formations, well drilling diameter up to 245mm.


Pneumatic Drilling Rig Tech information


Pneumatic Drilling Rig

260 meters
Dia.holeφ105-260mm
Advance Length one time6.6m
Working pressure1.7-3.0MPa
Air consumption17-35m³/min
Length of rod1.5m,2m,3m,6m
Dia. Of rodφ76, φ89,φ102,φ114
Lifting power24T
Rotation torque8500-11000N.m
Rotation Speed40-70r/min
Diesel EngineYuchai
Engine Power85Kw/2200rpm
Travelling speed0-2.5 Km/h
Climb capacity30°
Weight9000kgs
Dimension5900x2000x2850mm
ApplicationComplicated geological conditions:Rock,Mud,Sand etc.
Drilling WayTop drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer4",5",6",8" Drill hammer or CIR110, 130, 150,170


Pneumatic Drilling Rig Features


1. The engine uses a high-power engine;

2. Walking device: the walking motor is equipped with a gear box, which is durable and has a long life;

3. Hydraulic oil pump; parallel gearbox design with separate oil pump units, sufficient power supply and reasonable distribution, unique hydraulic system design, simple maintenance and low cost;

4. Power head device; gearbox is cast in one piece, dual motors provide power, large torque, durable, and low maintenance cost;

5. Drilling rig chassis; professional excavator chassis, durable, large load-bearing, wide chain plate, little damage to hard roads;

6. Lifting force; patented design composite boom, the boom is small in size, long stroke, double cylinder lifting, large lifting tonnage;

7. The lifting boom of each drilling rig is equipped with a stopper to protect the safety of the oil cylinder and ensure the safety of work;

8. Each hydraulic oil pipe is covered with a protective jacket to make the service life of the oil pipe longer.


Pneumatic Drilling Rig Use Scope:

We are offering a wide range of Water Well Drilling Rigs and mining Drilling Rigs, which is available in various models and sizes. Extensively used in construction and other engineering related industries, these are known for their international quality and performance. These rigs are offered in various technical specifications as per the client's specific need.

Drilling Work Attentions In Process

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.



Send message to this supplier
Mr. jilei
Tel: 86-311-66792900
Mobile: 18633074135
Enter between 20 to 3,000 chatacters.
Contact Method
Hebei Nailiang Machine Equipment Co., Ltd.
No.585 Tianshan Street, Gaoxin Zone, Shijiazhuang, Hebei, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center