260 Meters Water Well Drilling Equipment Different Hole Diameters 77kw Steel Crawler

Price: 6800.0 USD
Trade Term: FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW
Payment Terms: T/T,L/C,D/A,D/P,WU,Paypal,Money Gram
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Price: Negotiation 
  • Payment Terms: L/C, D/A, D/P, T/T, Western Union 
  • Supply Ability: 20000 sets 
  • Delivery Time: Within 7-12 days 
  • Power Type: Diesel 
  • Application: high drilling efficiency 
  • Color: Yellow 
  • Drill depth: 260 Meters 
  • Drilling Diameter: 105-260mm 
  • Weight: 6T 
  • Place of Origin: Hebei  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 20000 sets per year
  • Packing:Wooden case or naked
  • Delivery Date: Within 7-15 days

NL260 Water Well Drilling Rig Introduction


NL-260 drilling rig 's drilling depth is 260 meters ,the hole diameter is from 105 to 260mm,these well drilling rig series mainly applied to industrial and civil drilling and geotemperature drilling. It has the advantages of large diameter of drilling hole, deep drilling, fast footage, and high efficiency.


NL 260 Water Well Drilling Rig parameters


Drilling Depth260m
Dia.holeφ105-260mm
Advance Length one time6.6m
Working pressure1.7-3.0MPa
Air consumption17-35m³/min
Length of rod1.5m,2m,3m,6m
Dia. Of rodφ76, φ89,φ102,φ114
Lifting power24T
Rotation torque8500-11000N.m
Rotation Speed40-70r/min
Diesel EngineYuchai
Engine Power85Kw/2200rpm
Travelling speed0-2.5 Km/h
Climb capacity30°
Weight9000kgs
Dimension5900x2000x2850mm
ApplicationComplicated geological conditions:Rock,Mud,Sand etc.
Drilling WayTop drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer4",5",6",8" Drill hammer or CIR110, 130, 150,170


Features of NL 260 Water Well Drilling Rig


1, it is a high efficiency and multi-functional down the hole water well drilling equipment, It can be used to drill water well, agrecultural irrigation well, geothermal well and other type well holes. It is sepcial suitable for mountain area and rock stratum water sourcing project.

2, This machine can drill in different stratum, The maximum bore diameter can be 450mm.

3, This machine adopts big torque hydraulic motor for power head and brand diesel, big diameter hydraulic cylinders for the hydraulic control system. The brand diesel is protected by 2 levels air filtration systems and also can directly use the clean air from the air compressor.

4,Unique bump set design and centralize controlled operation system is easy to maintain and convenient for machine operation.

5,This machine adopts excavator crawler chassis and make the machine a high off-road performance, It also can be mounted on a truck to make it more maneuverability.

6, Two gears rotation and feeding speed makes it work in soil and rock layers.


FAQ of NL260 Water Well Drilling Rig


Q: Are you original manufacturer? A:Yes, we are a manufacturer in construction machinery and we have the whole series products

Q: What kind terms of payment can be accepted? A:Normally we can work on T/T.

Q: What about the delivery time? A:7 days after receiving the deposit.

Q: What about the warranty time? A:12 months after shipment,engine is 6 months.

Q: What about the Minimum Order Quantity? A:The MOQ is 1 set.

Q: Could you stick customers brand on the products? A: We warmly welcome the OEM orders.


Precautions for courtyard drilling


1. Consider whether the well depth is reasonable

We should first investigate whether there are cables, sewers and other facilities under the ground, and avoid unnecessary damage.

2. Convenience, health and other issues should be considered.

After drilling the well, find some charcoal and throw it into the well with a bag and press it at the bottom of the well to absorb foreign toxins. After having water, you can put a few small fish down, which is a good way to test the safety of water quality.

3. The well should not be too deep. It should be above the ground and should be blocked with bricks and stones. It is better to have a cover, so as to prevent dirt from falling in, make people feel safer and avoid unnecessary dangers.

260 Meters Water Well Drilling Equipment Different Hole Diameters 77kw Steel Crawler


Send message to this supplier
Mr. jilei
Tel: 86-311-66792900
Mobile: 18633074135
Enter between 20 to 3,000 chatacters.
Contact Method
Hebei Nailiang Machine Equipment Co., Ltd.
No.585 Tianshan Street, Gaoxin Zone, Shijiazhuang, Hebei, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center