LPG tank powder coating line

Payment Terms: T/T
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • custom design: for LPG tank powder coating line 
  • type: automatic powder coating line 
  • Required plant size: L52m×W28m×H6.5m 
  • Output: 60-75pcs per hour 
  • Heating source: natural gas 
  • Pretreatment system: immersion tank type 
  • Place of Origin: Zhejiang  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 6sets per year
  • Packing:nude packing
  • Delivery Date: 65 days

Design  basis of LPG tank powder coating line

1. Name of workpiece: LPG  tank
2. Max size of LPG tank: Diameter: 440mm Height: 1200mm
3. Max hanging size on each hanger: L500mm×W500mm×H1500mm
4. Loading capacity on hanging hook: ≤35kg
5.Suggested interval between 2 hangers: 300mm
6. Conveying speed: 1m/min
7.Output: 60-75pcs per hour
8. Spraying method: 4 auto spray guns (match on 1 reciprocator) & 1 manual  spray gun
9. Heating source: natural gas (Other choices are available: electricity, oil  or coal)
10. Pretreatment system: immersion tank type
11. Required plant size: L52m×W28m×H6.5m

Design  description for LPG cylinder powder painting line
1. According to the shape of LPG tank, we design the pretreatment to be economical  immersion tank type with 6 stage processings.
2. After chemical cleaning, he pre-treated workpieces will be conveyed to  drying furnace for water removal on their surface. The drying furnace is designed   being tank type to match with immersion pretreatment tanks, and with a top-door  design for easy access of pre-treated workpieces.
3. After drying, the workpieces are ready for powder particle adhesion. Please  manually feed them on auto powder painting line. For a better painting result,  the spray booth, waster powder recycling system, reciprocator adopts advanced  equipments in China through our careful selection. And the spraying guns, both  auto and manual are imported from foreign famous company for a longer service  life. Then these workpieces will be sent to gas-fired furnace tunnel to let  powder melt into a smooth coating.

Process  flow for LPG holder powder coating line
1. Feed your LPG tank on crane hanger for the preparation for chemical cleaning
2. Pre-degreasing stage
3. Degreasing stage
4. Rinsing stage
5. Surface conditioning stage
6. Phosphating stage
7. Rinsing stage
8. Drying off oven to remove surface moisture (100-120℃  for 10 mins)
9. Manually transfer the pre-treated objects to powder coating  line
10. Powder application with spray guns
11. Powder curing (180-200 ℃ for 20 mins)
12. Finished product discharging
If above parameters  cannot meet with your strict coating need, please contact us for more detail.  We can make some adjustments or even improvements to suit your actual  production conditions.


Send message to this supplier
Ms. sally xu (sales manager)
Tel: 86-571-88194898
Mobile: +86-13906508694
Enter between 20 to 3,000 chatacters.
Contact Method
Hangzhou Color Powder coating Equipment co.,ltd.,
No.57 Xiangcang RD,Xihu District, Hangzhou, Zhejiang, China (Mainland) / 310013
Fax: 86-571-86015003
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center