Metal Shot Blasting / Shot Blast Cleaning Machine 1000 * 2000mm Workpiece Size

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

 

 

HGP1020-8 Type Shot Blasting And Cleaning Machine With 1000×2000mm Work-piece Size

 

 

1. Specifications:

 

Model HGP1020-8
Width × height ≤1000×2000mm
Length 3000-15000mm
Quality requirement Sa2.5, Ra15-50
Impeller head (8)  
Model of impeller head Q034II
Quantity of shot-blasting 8×200kg/min
Turning speed 2950r/min
Shot blasting speed 65-70m/s
Power of shot-blasting machine 8×11KW
Work-piece conveying system  
Length of input roller conveyer 15000mm
Length of output roller conveyer 15000mm
Load capacity of roller conveyer 1000kg/m
Conveying speed 0.4-4m/min
Shot conveying system  
Capacity of shot conveying 120T/h
Longitudinal screw conveyor  
Driving power 5.5KW
Power of bucket hoister  
Driving power 7.5KW
Hoisting speed 1.5m/s
Hoisting capacity 120T/h
Power of curtain separator  
Driving power 5.5kw
Width of curtain 2000mm
Steel shot diameter 1.2-1.8mm
Model of dusting system LMF-I
Discharge quantity 120mg/m3
Wind speed of the gate 5m/s
Handling volume of dusting system 18000m3/h
Quantity of filter core 18
Filtering area (18×20) 360
Centrifugal ventilator Model 4-72-5A
Centrifugal ventilator air volume 18000m3/h
Centrifugal ventilator wind pressure 2022 Pa
Centrifugal ventilator power 15kw
Cleaning system ventilator power 15kw
Overall power ≈140Kw
Whole machine air volume 18000m3/h


2. Description:

 

Guard late in the shot-blasting chamber and nut are vulnerable parts, the wear abrasion should be always checked and changed in time. Pay attention to the splicing when install the guard plate to prevent damaging the wallplate and danger.


Rubber curtain on the exit and entrance of auxiliary chamber are vulnerable parts, if damaged, you should repair or change in time to prevent the overflow of shot and dust.


Men should keep away from the entrance and exit of chamber when working to prevent shot splash into eyes, and warn with board.


When check inside the cleaning chamber, you should cut off power first and warn with board, strictly prohibit operate with electricity, or you’ll be dangerous.

 


Send message to this supplier
Mr. Ms. Chris
Tel: 86-510-88794887
Enter between 20 to 3,000 chatacters.
Contact Method
WUXI ZHOUXIANG COMPLETE SET OF WELDING EQUIPMENT CO.,LTD
Donghu Industry Garden, Donggang Town,undefined, Wuxi, Jiangsu, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center