WPC PVC free foam board production line
WPC PVC free foam board production line are applied in PVC powde+Wooden powder+other additives raw material to produce kinds of wpc foaming board. Adopting our company's special design and unique processing, these lines can produce different proportion (0.55-0.95) profile wood plastic products to meet customer's needs. With different products, we can match different performance twin extruder or single extruder which equipped with auxiliary devices such as vacuum forming machine, haul-off and cutting machine, loading shelves to optimize its capacity. By using moulds which are specially designed with customer's products, customer can produce the products that they need.
SJZ92 KPM-FOAM1220 WPVC foam board making machine
Main tech parameters:
Product material: | Wooden powder + PVC powder + Other additives |
Products max width: | 1220mm×2440mm (Length can be adjusted) |
Product thickness: | 25-50mm |
Extrusion capacity: | 600kg/h (capacity varies with the density change) |
Total installed power: | 215kw (Including mould heating power) |
reference pic:
extrusion line
extrusion die:
Hual-off:
cutter:
3, BENK's Service:
3.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
3.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3.3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 13 months since date of bill of loading
During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.
c. Long-term service:
BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
We thank you for your inquiry and would be pleased to receive your order soon.
ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.