steel storage building kits made of high strength structural steel pre-built

Price: 1000.0 USD
Trade Term: FOB
Payment Terms: T/T
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Welding standard: AWS D1.1 
  • Service Offered: Design, fabrication, packing, transport, erection 
  • Drawing Design: by client or by us by client 
  • Software used: PKPM Tekla STAAD-Pro 
  • Model No.: 1-773 
  • Place of Origin: Shandong  
  • Min.Order: 100 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 3000 Ton/per Week
  • Packing:sea worthy packing
  • Delivery Date: 20 days

1. Characteristics for the steel storage building kits ( made of steel frame ) :

1 ) Wide span : single span or multiple spans , the max span is 36m without middle column .

2 ) Low cost : Unit price range from USD35 / m2 to USD70 / m2 according to customers' request .

3 ) Fast construction and easy installation .

4 ) Long using life : up to 50 years .

5 ) Easy construction , time-saving , and labor saving 
6 ) Flexible layout , beautiful appearances , and higher space efficiency 
7 ) Be used as warehouses , workshops , shopping mall , dinning hall , stadium , etc .

8 ) Others : environmental protection , stable structure , earthquake proofing , water proofing , and energy conserving .

 

2. We supply both common steel building and the special steel structure:

Besides structural steel building like workshop, warehouse, high rise building, steel storage building kits ( made of steel frame ) etc, we can also do nonstandard structural steel member fabrication according to client' s sample or drawings, like special shape structures, board girder, industrial steel frames, belt conveyor and other supporting frames, steel gallery, reclaimer and deck parts etc.

 

3. Project case- 10000 tons heavy steel structure for Indian cement plant Project:

Description:

The whole steel consumption of this is more than 10000 tons, Among which, the steel consumption of steel roofing truss for steel structure homogenization silo and structural steel bunker is about 7000 tons.

Raw materials silo, clinker materials silo, electricity dust removal, pre-heater and other structures, together with steel structure buildings for subsidiary equipment, total steel structure components reach approximately 3, 000 tons.

 

4. Certification for steel storage building kits ( made of steel frame ) :

We are always committed to the development of steel structure. By far we have achieved the following certificates:

CE EN1090 certification

Quality Management System Certification ISO9001: 2008, by BV France

Environment Management System Certification ISO14001: 2004, by BV France

Occupational Health and Safety Management System Certification, by BV France

CWI certificate

TWI certificate

ASME certificate

AWS welder certificate etc.

 

5. Our seaworthy packing system for steel storage building kits ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Are you manufacturer or trader ?

We are manufacturer. Welcome to visit us at any time!

 

2) How can you avoid size error in supplying us the steel storage building kits ( made of steel frame ) ?

We select international size error standards;

Use specified equipment to cut shear and rectify steel plate according to steel thickness;

Standard weld and installation order to lessen deformation.

 

3) What is the cost if we ask your engineers to assemble ?

Round-trip air tickets, eating, living, translation fee, visa fee and salary.

Our team include senior engineers with professor titles, first-class registered constructors, first-class registered structural engineers, first-class registered cost engineer, registered architect, American CWI engineer, EN TWI engineer, EN IWE welding engineer, American NACE painting engineer and various technicians with senior and medium professional titles.

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center