ligth steel frame and prefabricated steel structures recyclable at Laos area

Price: 1000.0 USD
Trade Term: CIF
Payment Terms: T/T
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Software used: American SAP2000 American STAAD-Pro 
  • Service Offered: Design, fabrication, packing, transport, erection 
  • Shipment by: Container or bulk ship 
  • Main structure: Welded H section,Lattice structure,Tubular column or beam,space frame etc 
  • Model No.: 1-27 
  • Place of Origin: Shandong  
  • Min.Order: 50 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 10000 Ton/per Month
  • Packing:Components will be packaged by steel pallet
  • Delivery Date: 15 to 40 days

1. Our Design & Engineering Services for the Steel building ( made of ligth steel frame ) :

1 ) Experienced and skilled team of designers including CAD designers and 3D designers has the capacity to deliver outstanding designs for your project .

2 ) Simple design service is free of charge to all clients to ensure customer .

If you require more complex engineering of structures such as load baring capacities we can also provide this service requiring designer fee .

3 ) We look forward to delivering exceptional designs and advice for your project .

Installation supervision and after-sales service :

If needed , we will dispatch our professional workers to conduct assembling guide or technical support for you on site .

 

2. Our strength on the Steel building ( made of ligth steel frame ):

1) Rich experience

Rich project experience in different area of different continents.

2) Professional design and R& D team

Full solution for steel building design. We could make the design as per your requirement, or give your professional suggestion.

3) Advanced production equipment

We possess plenty of advanced production equipment for structure steel and cladding materials.

4) Quality control

Professional procurement team making sure all materials with good quality and are from China top steel mills.

Our workers have more than 10 years experiences and certification for professional welding. Half or them got the AWS and EN welder certificate.

Our factory operation under highest international standard, ensure the steel fabrication works with high technology.

 

3. Project case- Egypt Structural Steel Pre-engineered Building, 4000 SQM:

The workshop is build in 2009, divided into three parts, include materials manage area, flour produce area and storage area, general total area is 4000 square meters. The workshop adopt portal frame, partly adopt three story frame structure; main steel structure is welded H steel, two coats mid―gray paint on surface for rust prevention, galvanized purlin, roof and wall is single steel sheet, shutter windows on the wall for ventilate.

 

4. What you can get from us for your demanded Steel building ( made of ligth steel frame ) :

1) Steel structure special designing and processing

2) EPS sandwich panel( for wall, roof, floor)

3) All construction & decoration materials &downpipe are strictly selected.

4) Designing & Installation drawings( in details)

5) Full support in installation technology & guidance

6) Engineers' guidance on-site in your place is available

7) Custom-made service is available

 

5. Packaging & Shipping for Steel building ( made of ligth steel frame ) :

1) Using container:

container of 20 feet, and container of 40 feet

2) By sea for batch goods, for container or bulk-cargo ship, port receiving.

3) Customers specifying freight forwarder or negotiable shipping methods

4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.

5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.

6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.

7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.

 

6. FAQ:

1) How can I install these Steel building ( made of ligth steel frame ) together as a building after cargo arrived ?

Normally, most clients choose to install the steel building structure frame themselves or ask local technical engineer for further instruction.

If local technical support is not available or cost too much, we could also provide technical support engineer cross over-seas for installation guide even with our installation engineering team.

 

2) How to maintain my Steel building ( made of ligth steel frame ) years of using ?

Steel building ( made of ligth steel frame ) are built for long-time, reliable, steady usage purpose, the maintenance process is easy to operate and complete, most our product can live 10-15 years with minimal maintenance work like gel filled and paint spray. We will keep tracking the usage performance of our products and provide maintenance instruction for our clients.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!