capital metal buildings and steel building kits cost-saving at Romania area

Price: 1000.0 USD
Trade Term: CFR
Payment Terms: T/T
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Software used: PKPM Tekla STAAD-Pro 
  • Service Offered: Design, fabrication, packing, transport, erection 
  • Product Characteristics: 1)Fine gloss exterior, anti-corrosive 2)High strength, satisfactory property of the steel 3)Anti-seismic, wind resistanc 
  • Installation: Provide full set of construction drawings and video to direct installation 
  • Model No.: 1-500 
  • Place of Origin: Shandong  
  • Min.Order: 50 Metric Ton
  • Means of Transport: Land
Supply Capacity
  • Production Capacity: 3000 Ton/per Week
  • Packing:sea worthy packing
  • Delivery Date: 15 to 40 days

1. we can give you a quotation for the capital metal buildings ( made of steel frame ) if you offer this :

A : Customers have the drawings

we can provide you the accurate quotation and full service of production , shipment and installation guide , which is high quality and low cost . Because we own all kinds of technical facilities , complete test instruments and advanced production process .

B : Without drawings

Our excellent design team will freely design the light steel structure warehouse , workshop and other steel buildings for you . If you give the following information , we will give you the most satisfactory price and drawings .

1 . Dimension : Length , width , height etc .

2 . Doors and windows : Dimension , quantity , position .

3 . The material on the roof and the wall .

4 . Local climate : Wind speed , snow load , seismic load , temperature etc .

5 . If you have other requirements , please also inform us .

 

 

2. Our products scope include:

Single layered light and MID-sized workshops and warehouses, capital metal buildings ( made of steel frame ), single layered heavy duty workshops, wide-span public buildings, high-layered and super high-layered buildings, muti-layered industrial workshops, office buildings and houses, bridges, wide-span highway bridges and bridges in city, viaducts; industrial platform and support; structures that can be dismantled and transported, etc

 

3. Project case- Extended Ship Manufacturing/ Repair Yard& Office Building-Singapore:

Detailed introduction

Location: Singapore, heavy steel structure fabrication work

Tonnage: 2000ton( Including All Main frame and Secondary Structures)

Structure Type: lattice column and truss girder with crane capacity 2x 50T, 1x 32T, 2x 30T, 2x 20T, 2x 15T, 2x 5T.

Execution: October.15, 2012

Difficulty: Material Substitution From British Standard Into Chinese standard and Make the converting and output all the shop-drawings accordingly.

This project, the fabrication standard is as per American standard, all the welders shall have the AWS welder certificate, the 3rd party QC will stay in our factory track the whole fabrication process. Finally after 50 days efforts, our products pass the inspection by client 100% at once. Client feel happy to work with us. Now we are the VIP supplier in client' s list.

 

 

4. DESIGN STANDARD& SOFTWARE for capital metal buildings ( made of steel frame ) :

 

Standard: America Standard, Australia Standard, England Standard, China Standard, etc.

Software: SAP2000, Auto CAD, PKPM, RSTAB, PROE, MTS, Tekla Structures( Xsteel) , 3D3S, Tarch, etc.

 

5. Our seaworthy packing system for capital metal buildings ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Q: How could I control the cost of building a capital metal buildings ( made of steel frame ) ?

A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

 

2) Q: How Long does it take to build a capital metal buildings ( made of steel frame ) ?

A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.

 

3) Q: Is it difficult to build a capital metal buildings ( made of steel frame ) ?

A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center