Primary steel prefab utility buildings cut down construction time

Price: 1000.0 USD
Trade Term: CFR
Payment Terms: L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Material Grade: Chinese Q235& Q345B ASTM A36& A992 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Standard: AISI, ASTM, BS, DIN, GB, JIS Australian standard 
  • Certificates: 1. ISO9000, ISO14000, ISO18000 by BV France. 2. EN-1090 CE certificate, American CWI, European TWI, European IWE 
  • Installation: Engineer are able to stay at site to direct construction. 
  • Model No.: 2-041 
  • Place of Origin: Shandong  
  • Min.Order: 120 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 9000 Ton/per Month
  • Packing:Sandwich panels covered with plastic film
  • Delivery Date: usually as customers'order

1. Design parameters of the Steel building ( made of Primary steel ) need to be provided :

1) Live load on roof ( KN/M2 )

2) Wind speed ( KM/H )

3) Snow load ( KG / M2 ) - If Applicable

4) Crane ( if you have ) , Crane span , Crane lift height , max lift capacity , max wheel pressure and min wheel pressure

5) Size : width X length X eave height , roof slope

6) Or your idea !

BUT maybe you are unsure about what type or what needs you have regarding your warehouse / workshop , or this project is your first one . Don't worry , we will teach you to choose the right style and the finest design within your budget .

2. About our company:

1) We have a group of professional engineers, most of whom has more than 10 years' experiences in architecture field.

2) Established for more than ten years, our company has got a various of experiences in all kinds of steel structure& steel building design, manufacture, installation and so on. The work staffs have excellent skills. Some of them had helped customers to install the warehouse around the world.

3) We have the capacity of annually 200,000 tons steel structure. We also have possessed more than 300 sets of large precise and advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, shot blasting machines and so on.

 

3. Project case- Description of Hengda steel structure workshop building:

The axis area for this steel structure workshop building is 19578m2

Axis dimension is 180m, 108m, the eave height is 14.15meters.

The primary member is Q345B, all are sand-blasting,

The surface treatment quality required meets GB 8923 SA 2 1/2 Grade

Painting is two coats of anti-corrosive primer and two alkyd finish

Crane runway girder is equipped in each span, install 32mt and 16mt overhead crane

 

4. The surface treatment for our Steel building ( made of Primary steel ) :

We have pretty good preservative treatment for steel frame as follows as per the highest international surface treatment code:

1) Clean the steel( reach to Sa2.5 Grade, China Code) , then we will spray paint:

Two layer epoxy zinc rich primer and 2 layer anti-rust paint( total thickness: 100-120um) ; Warranty period: 18-20 years under normal conditions.

2) Hot-dipped galvanized, when the thickness of parts is less than 5mm, thickness of hot-dipped gal is more than 65um; when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions.

 

5. Packing & Delivery for Steel building ( made of Primary steel ) :

For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift

For cladding: Plastic film wrap the roof and wall corrugated single steel plate.

but for sandwich panel will load into container piece by piece

This package is to protect the goods from damage, during the transportation.

 

Delivery:

Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.

Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.

 

6. FAQ:

1) Do you offer guiding installation on site overseas for Steel building ( made of Primary steel ) ?

Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas. Besides, We also have our own abroad guiding installation team consisting of more than 400 people.

They have succeeded in many countries, such as Pakistan, Russia, Algeria, Romania, Namibia, Tajikistan, Argentina, Australia, Republic of Uzbekistan.

 

2) What kind of special service does your company provide for Steel building ( made of Primary steel ) ?

We have professional design, production and construction teams, providing customize solution for steel building. The company provides consultation for Steel building ( made of Primary steel ) in all aspects, including design, processing and on-site installation and etc.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center