prefab workshop Industrial Structural Steel Workshop DIN code verified

Price: 1000.0 USD
Payment Terms: L/C,L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Insulation: PU/EPS/Glass Wool/Rock Wool 
  • Wall: Sandwich Panel / Single Steel Sheet 
  • Accessories: Skylight, Gutter, Downpipe, etc 
  • Storey: One Storey, Two Storey, Muti Storey 
  • Large Span: Customized 10-40m 
  • Model No.: 2-750 
  • Place of Origin: Shandong  
  • Min.Order: 100 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 3000 Ton/per Week
  • Packing:Panel accessories will be packaged in wooden box
  • Delivery Date: 15 to 40 days

1. prefab workshop ( made of steel frame ) products description :

Dimensions

Length

H beam : 4000 - 15000mm

Thickness

web plate : 6 - 32mm      

wing plate : 6 - 40mm

Height

200 - 1200mm

Color

Depend on customers' needs

Advantages

1 . Design according to customers' requirements

2 . Manufacture under complete quality control system --- ISO9001

3 . Installation with instruction of experienced engineers

4 . Easy to assemble and dismantle

5 . Eco-friendly material: can be used for several times and recyclable

6 . Short construction period , long using time

7 . High strength and stiffness , high weight bearing.

8 . Sound insulation and heat insulation ; antisepsis and damp proofing ; waterproof and aseismatic

Main components

Main frame

H beam

Purlin

C or Z section steel purlin

Brace

Anchor , ordinary , high strength bolt

Bolt

Sandwich panel or steel plate

Roof &wall

PVC or aluminum alloy door

Door

Sliding or rolling door

Insulation panel

EPS , Rock wool , PU sandwich

Material

 Q235B Q345B  China standard steel

 Sheet

 0.5mm or 0.6mm galvanized sheet

 

 

2. Who we are:

We are mainly specially steel structure construction company undertaking the design, fabrication, assembly, and after-sales service of various types of prefab workshop ( made of steel frame ), civil construction, heavy steel structures, stadiums, industrial workshops and warehouse building, steel structures high-rise building.

 

Now we have 3 heavy steel production line, six light steel production lines, 3 H-beam secondary processing lines, and advanced digital-controlled multi-head cutting machine,automatic submerged arc welding machine, assembly machine, calibrating machines, full-automatic shot blasting machines, totaling 200 equipment or more.

 

3. Project case- Description of Hengda steel structure workshop building:

The axis area for this steel structure workshop building is 19578m2

Axis dimension is 180m, 108m, the eave height is 14.15meters.

The primary member is Q345B, all are sand-blasting,

The surface treatment quality required meets GB 8923 SA 2 1/2 Grade

Painting is two coats of anti-corrosive primer and two alkyd finish

Crane runway girder is equipped in each span, install 32mt and 16mt overhead crane

 

4. Urgent delivery to meet client' s urgent requirement on prefab workshop ( made of steel frame ) :

Do you need a prefab workshop ( made of steel frame ) FAST ?

A number of our standard steel workshop or warehouse models can ship within 30 days! Depending on the size and complexity, preliminary drawings for your approval and stamped engineer drawings for permits will be generated within days.

 

5.  prefab workshop ( made of steel frame ) advantages:

1) Accurate design

Metal and steel building are engineered, generated and manufactured using computer technology.

2) Improved Flexibility, Design

Prefab steel buildings are expandable and manufacturers are also very flexible and accommodating to design and engineer custom plan for you project, offering you more freedom in the design and layout of your building. In addition, you can simply add another section to the steel building if you need more space or disassemble in another location.

3) Quick Assembly

Pre-fabricated steel structures arrives at the construction site in ready-to-assemble sections. All you have to do, is lay it out and about it together. As most kits arrive with all components included, they are simple to assemble and provide massive savings on labor and material costs.

 

6. FAQ:

1) How to buy your ideal prefab workshop ( made of steel frame ) ?

A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, balance before loading by TT.

 

2) What is the delivery time of prefab workshop ( made of steel frame ) ?

A: It all depends on the order quantities. Usually, delivery time will be within 1 to 2 months.

 

3) How to install after the goods arriving destination ?

A: We will provide detailed erection dwgs to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.  

 

4) Q: Does your steel building can only be used in residential building ?

A: Absolutely not. It can be used in all kinds of buildings, such as hotel, commercial office, school, entertainment club, light industrial workshop, etc.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center