Towing Tractor Drive Mobile Asphalt Batch Mixing Plant With Wearable Blade

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Towing tractor drive mobile asphalt batch mixing plant with wearable blade&arm in mixer

 

QLB1000-Y Model Batch Mobile Asphalt Plant

Installation instructions

 

General description of mobile type HMA(hot mixing asphalt plant)

 

QLB-Y Model Batch Mobile Asphalt Plant is simple and speedy forced intermittent asphalt mixing plant produced by xitong technology group for asphalt pavement construction facing domestic and overseas markets. The equipment is composed of 78 units,installed by the crane. Installation and debugging will be finished in 67 days after the new equipment comes on the scene. It can work and discharge normally in less than 10 days. The equipment is composed of following units: cold aggregate supply systemdrying and hoisting systemmixing tower systempowder supply systemdust collecting systemasphalt heating systemasphalt storage tank system and control system.

Preparation before installation of mixing plant:

Check foundation drawing and finish condition.

Check if the installation area meets the needs of construction.

Check if the supply power is 380V/50HZ(or60HZ),and of right capacity.

Check the distance from power line to control room of mixing plant.

Check the location of crane:50t crane 1 set25t crane 1 set

Crane operators should be in placewelding machine 1settorch cutting device(oxygen,acetylene)1setauxiliary worker 46.

Check if there is 1000kg standard weight(each 20-25kg)for checking scales.

Check completeness and intactness of unit components and corresponding spare parts.

 

 

Model QLB-Y1000 QLB-Y1500 QLB-Y2000
Output 80t/h (standard working condition) 120t/h (standard working condition) 160t/h (standard working condition)
Cold feeder Volume/No. 8M3/4 10M3/4 10M3/4
Agitator kettle Capacity More than 1000kg/batch More than 1500kg/batch More than 2000kg/batch
Drying Cylinder Φ1540*6800mm Φ1840*8100mm Φ2000*8860mm
Fuel type Diesel/mazut/LPG/Coal powder Diesel/mazut/LPG/Coal powder Diesel/mazut/LPG/Coal powder
Hot aggregate bin 20T/4 25T/4 25T/4
Ready product Temperature 130-165 130-165 130-165
Dust Collection method gravitational dust collector & Second baghouse dust collector gravitational dust collector & Second baghouse dust collector gravitational dust collector & Second baghouse dust collector
Asphalt tank capacity 20M3 30M3 30M3
Blackness of exhaust gas Ringelmann I Ringelmann I Ringelmann I
Operation room noise ≤70db(A) ≤70db(A) ≤70db(A)
Environment noise ≤80db(A) ≤80db(A) ≤80db(A)
Heat conduction oil furnace 300,000kcal/h 300,000kcal/h 500,000kcal/h
Total Installation Power ≈200kW ≈310kW 356KW

 

 

 

 


Send message to this supplier
Mr. Mr. Jia Wang
Tel: 86-510-85361108
Enter between 20 to 3,000 chatacters.
Contact Method
WUXI XITONG TECHNOLOGY GROUP
No88,Xuedian South Road, New District, Wuxi, Jiangsu, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center